Highway Zagreb – Split – Dubrovnik Brezik tunnel, Otočac
Project:
Rehabilitation of the notch in km 140 + 130 northern pre-notch of the tunnel (left side).
Slope protection using wire meshes, anchors, steel cables, slope protection with shotcrete, stone cladding, stone masonry
Client:
Hrvatske autoceste d.o.o.
Value of works:
2.797.721,19 kn
Duration of works:
04.2013. – 11.2013.