Hotel Le Meridien Lav – Podstrana, Split
Project:
Rehabilitation of the slope behind building “A”.
Slope protection by installing self-drilling anchors, shotcrete, reinforcing wire mesh and strainers.
Client:
GEOSONDA d.o.o
Value of works:
1.209.467,285 Kn
Duration of works:
12.2020. – 06.2021.
Google earth