Adriatic Highway – Istrian Y
Project:
Construction of the grid structure, protection of the slope above the grid structure with anchor support assembly (self-drilling anchors, shotcrete, reinforcing wire mesh and strainers), construction of eco rings, installation of protective wire mesh and construction of gabion wall and terramesh system. Protection of the slope of the entrance and exit pre-notch of the Učka tunnel with self-drilling anchors, reinforcing wire mesh, shotcrete and strainers.
Client:
BUUYGUES TRAVAUX PUBLICS, Podružnica u Hrvatskoj
Value of works:
20.000.000,00 Kn
Duration of works:
08.2019. –