Pustinje Blaca museum and convent on the Island ofBrač
Project:
Construction of geotechnical anchors and installation of protective wire meshes, removal of rock blocks, construction of gabion walls
Client:
Centar za kulturu Brač
Value of works:
1.495.838,20 kn
Duration of works:
11.2012. – 05.2013.
Google earth